Skip to main content

Architect cost in Kolkata

How much will an architect cost in Kolkata?

Pick the roles, how many people and for how long — or the one-off jobs — and get an itemised range for Kolkata before anyone calls you. Exact quotes come from up to three ID-verified architects once you create your free account.

See the full rate card: 13 jobs priced for Kolkata →

House plan (layout only)
₹17 per sq ft
Full drawing set
₹39 per sq ft
Approval drawing set
₹27,630 per job
Step 11 / 1

What do you need done?

Pick everything that applies — you can combine several jobs or roles in one request.

Architect rate card for Kolkata (November 2026)

13 jobs and roles priced for your city tier: typical rates per unit, with no visit charge. Material and consumables are extra unless noted.

Plans & elevationsDrawings for your build

JobTypical rateNotes
House plan (layout only)₹20 per sq ft
Full drawing set₹46 per sq ft
Elevation & 3D views₹19,500 per job
Structural drawings₹23 per sq ft
Vastu-compliant layout₹10,400 per job

ApprovalsCorporation and panchayat

JobTypical rateNotes
Approval drawing set₹32,500 per job
Corporation liaison₹45,500 per job
Completion certificate help₹19,500 per job

SupervisionSite visits during build

JobTypical rateNotes
Site supervision visit₹4,550 per day
Monthly supervision₹32,500 per month
Full service, % of projectPrice on request

RenovationExtensions and changes

JobTypical rateNotes
Renovation design₹33 per sq ft
Extension or additional floor₹39 per sq ft

Typical market rates as of November 2026; quantities over four are stepped down, daily and monthly staff rates are per worker and not surge-priced, same-day work carries a premium. Your exact price is the architect's quote.

What affects an architect's price in Kolkata

  • Parts and material. Labour rates assume you supply the material. If the architect brings it, ask for the brand and a bill; the estimator shows that as a separate range.
  • Size and condition. Per-square-foot jobs are priced on your home's built-up area; badly worn surfaces, high ceilings and heavy furniture add time.
  • Shift and duration. Daily and monthly rates are per worker for an 8-hour day; 12-hour shifts, nights and short notice cost more, and monthly rates assume 26 working days.
  • Quantity. Quantities over four are stepped down, and a longer engagement gets a better daily rate.

Market rates for Kolkata's tier as of November 2026. Your exact price is the architect's quote, which you see before anyone starts.